Stanford School of Medicine Steam-Heating Hot Water Conversion

Stanford School of Medicine Steam-Heating Hot Water Conversion

Gayner Engineers served as Prime Designer and provided mechanical and electrical engineering services for the$7.5 million Steam-to-heating hot water conversion with controls upgrade.  .  Extensive survey was conducted for accuracy of existing record drawings and constructability validation.  A detailed survey was conducted to develop an inventory of all steam driven systems and equipment inside the buildings for capacity verification. 

Back to Infrastructure and Controls Upgrades